
Both the public website and the CMS behind it have moved from design into real, working builds. This page is a snapshot of exactly where things stand today, what's been completed, and what you'll be looking at by lunchtime tomorrow.
Design system through to installer packaging. Phase 6 is where we are right now.
Across design, website, CMS, and email. Compliance and installer work still ahead.
No repeated template with new text dropped in. Every page gets its own layout, same design system underneath.
Mission, focus pillars, live event highlight, and the organisation's story, live and pulling from the CMS.
Overview grids, each item opening its own full page with a Get Involved or Get Started call to action.
Upcoming events with live registration, and a creatively laid out blog of past ones below it.
Volunteer, partner, and donor paths, plus an ongoing blog of stories from the field.
Plain-language legal pages, GDPR and Kenya Data Protection Act aligned, live and linked from every form.
Colourful glassmorphism, drifting colour blobs, colour-coded hover glows, and a corner-bracket signature carried on every page.
Each role only sees the tools it needs. All five are scaffolded and functional.

User & role management, API/analytics/security settings, one-click website and CMS updates, and a full support ticketing system.

Every user gets private notes, reminders, a customisable dashboard theme, and direct messaging with the rest of the team.

Temp passwords, welcome messages, registration confirmations, and lead notifications, all on-brand. Admin can also send custom emails.

Cookie consent, encrypted passwords, server-side role enforcement, and an admin activity log. Currently the active phase of work.

A ready-to-install package for standard hosting, with future updates handled the same way, upload a zip from the Admin panel.

Every enquiry flows from the site into the CMS, gets claimed by a team member, tracked to completion, and closed out.
Every login is scaffolded and permission-tested as of Phase 3. Nobody sees more than their role needs.
Full configuration access.
Start to finish.
And the leads it brings in.
On every claimed lead.
Edits nothing.
The full map of both systems, built out through Phase 4.
Ten public pages
Five roles, one login screen